Ecogain has been commissioned to investigate the conditions for large-scale wind power and solar energy in Varberg municipality, as a basis for the municipality's upcoming master plan.
Read moreNjordr Offshore Wind AB is investigating the possibility of establishing wind power in the Swedish economic zone in the Baltic Sea. Up to 300 wind turbines are planned, and their location outside the Stockholm area has good potential to contribute to meeting the increasing need for renewable energy in a region that already has difficulty producing its own electricity and where opportunities for onshore wind power are limited. Ecogain has been hired to take overall responsibility for the consultation process for the project.
Read moreEcogain was hired to lead and carry out the environmental assessment of an area near the village of Rambo in Västerbotten County, which OX2 had identified as suitable for wind power. The assignment included the entire permit process according to the Environmental Code with consultation, environmental impact assessment (EIA) and many types of supporting studies.
Read moreIs it possible to adapt a new car test facility in the Swedish countryside according to the steps of the internationally accepted Mitigation Hierarchy?
Read more