Posts tagged MKB
Svenska Kraftnät: Accessibility study, consultation and environmental impact assessment.

A new 400 kV overhead line along the stretch Ekhyddan - Nybro - Hemsjö is planned to reduce the risk of power outages in the region. Ecogain receives the assignment from Svenska Kraftnät, which includes inventories along the nine miles and to drive the permit project forward with the preparation of consultation documents, background studies and environmental impact assessment.

Read more
OX2: Full permitting process for Rambo wind farm

Ecogain was hired to lead and carry out the environmental assessment of an area near the village of Rambo in Västerbotten County, which OX2 had identified as suitable for wind power. The assignment included the entire permit process according to the Environmental Code with consultation, environmental impact assessment (EIA) and many types of supporting studies.

Read more
Arise: Restart of large wind power project

When Arise was faced with completely new conditions after a judgment in the Land and Environment Court of Appeal, the company chose Ecogain as its overall consultant. Thanks to a strong resume in wind power, Ecogain was entrusted with a new EIA, consultation and several crucial inventories. Everything would form the basis for a new permit application.

Read more